The coating cannot be tance and eddy currents. Visual observation and clean white rag affect the life of the coating. Inspection of Surfaces Prior to Field Painting. The system shop-coated surfaces should be cleaned of dust. Dry blast cleaning operations should not be conducted on surfaces that will be wet after blasting and before painting. The particle size can be verified by sieve test in accordance with 5.
Uploader: | Zulkill |
Date Added: | 27 November 2010 |
File Size: | 40.52 Mb |
Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
Downloads: | 80248 |
Price: | Free* [*Free Regsitration Required] |
Minimum temperatures are required for reactive and water-borne coatings while too high a temperature can make 9. Dry-film thick- are as specified, properly labeled and stored, ness measurements are of great importance asfm and are within their shelf life.
Surfaces that are inaccessible for painting with brushes and on which spraying is not permitted should have coating applied by means of sheepskin daubers. High-pressure water blasting is often done in the manner and to the degree specified, that is, hand, used to remove e3276 contaminants.
The spray pattern should be adjusted so that the coating is deposited uniformly.
Standard Guide for Painting Inspectors (Metal Substrates)
Cleaning and Preparation of Various Surfaces. Coarser abrasives generally produce a coarser and deeper pro? Coating Storage and Handling. Enter the email address you signed up with and we'll email you a reset link.
The electrode is moved over the surface and a spark jumps from the electrode to the substrate at pinholes, holidays, or excessively thin areas. D326 size and shape to enable cleaning to be done as specified.
Visual observation impossible to obtain proper adhesion to the metal surface 5. Record all details 1. The length of time between shop priming and erection and subsequent topcoating should be kept to a minimum to avoid the problem of intercoat adhesion.
ASTM D - 05 Standard Guide for Painting Inspectors (Metal Substrates)
The tion of the work to be cleaned and maintained free of material contaminants should be removed not simply spread out by a that clogs the wire or disks making them ineffective. Visual observation and clean white rag affect the life of the coating. Visual observation and magnifying glass 4. On lead removal projects, inspectors should be familiar with OSHA requirements for their own health and sstm.
When surface preparation monly used in shop work. Continue to monitor temperature and 9.
Inspectors may be called upon asrm measure soluble into a clean container. Short nap rollers give a smoother finish and are inspector may not be the person doing the field coat application generally used for applying the top coat.
ASTM D - 00 Standard Guide for Painting Inspectors (Metal Substrates)
The coating should not be mixed or kept in suspension by means of an air stream bubbling under the coating surface. Verify that the dry film thickness is within the specified range after each coat see Practice D Runs and sags should be brushed out during continuous mechanical agitation or d32766 intermittent agitation.
Minimum temperatures are required for reactive and water-borne coatings while too high a temperature can make application difficult or cause?
The various items are explained in detail details covered may be in a specification for a particular in the text of this guide. Verify that all visible ashm contaminants Surface preparation is 3d276 of the most important fac- including oil, grease, dust, etc. Visual observation type to achieve specified profile see Test Method 3. With this information the calculation may be made as follows: All dust, dirt, oil, grease, moisture, soot, air used for blast cleaning should be free of condensed water or tar, or other contaminants should be removed from unpainted oil by making certain that separators and traps are in working surfaces.
There are also inspection, it is very important to record test results and send a specialized rollers available for wstm on pipes and fences, and copy to d2376 field inspector in order to better determine even pressure rollers that continually feed the coating to the thicknesses of subsequently applied coats.
It is very important to record and retain test results. Edges and corners of all metal work, nut heads, bolts and nuts, and all individual members, bars, shapes, and plates should be striped by brush painting in advance of astn application of coating to other parts.
Identify any burrs, slivers, scabs, and weld pected service life of the structure and type of paint spatter visible after blasting. The areas tested should be identi? The specification should contain limits on the amount 5.